Implementing the rehabilitation works for 15 high-voltage transmission line towers (66 kV) in the Suez Canal Electricity area.
Medium and low voltage power grids
Medium and low voltage electrical distribution networks
Laying of medium and low voltage electrical cables and overhead lines of medium and low voltage
Synchronization systems to run more than one generator in parallel Synehronizing systems
We work to provide security through the fire alarm system and electronic fire control